TLC (Smirnoff)-Fogelsville, PA
This project was a total plant reconditioning. It lasted 12 months and required a work force of up to 145 men at one time.
Scope of Work:
- Rebuilt Two Pasteurizers
- Installed Water Filtration System
- Installed Stainless Steal Product Piping
- Modified Product Storage Tanks
- Built Transfer Stations for 100 Percent Alcohol
- Built Bottle Filler
- Installed Labeler
- Installed New Bottle Conveyors
- Installed Zero Pressure Tables
- Rebuilt Pallet Stackers
- Concrete Floor Work
- Electrical Programming
|